
The Keith Valley Middle School building at 227 Meetinghouse Road in Horsham, Pennsylvania is a 60-year-old school that is currently undergoing construction to be replaced by a new building. The new building is expected to be completed in 2025.
The new Keith Valley Middle School will be a 21st-century learning environment that will be designed to meet the needs of today’s students. The building will be energy-efficient and will have a number of sustainable features, such as solar panels and rainwater harvesting.
The new school will also have a number of amenities that are not currently available at the old school, such as a swimming pool, a fitness center, and a theater.
Project Location: Horsham, PA, USA
Sector: Educational
Discipline/Trade: Plumbing
Scope of Work: Modeling, Coordination, and Shop drawings
Level of Development (LOD): LOD 350
Software Used: Revit, Navisworks