
The Roseville Joint Union High School District office is located at 1750 Cirby Way, Roseville, CA 95661. The building is a two-story, 26,000 square foot facility that was completed in 2023. It was designed by the architectural firm FLINT.
The building has a number of sustainable features, such as
Project Location: Roseville, CA, USA
Sector: Educational
Discipline/Trade: Plumbing
Scope of Work: Modeling, Coordination, Shop drawing
Level of Development (LOD): LOD 350
Approx. Project Area: 15,801 sq. ft.
Software Used: Revit, Revitzo